The scope and pace behind the Career Institute West erection.
Of structure erected
Crew members on site
To top out
Of steel erected
Limited laydown space shaped every delivery, pick, and shake-out on this job. Here's how we kept erection moving.
This massive structure did not come with ample laydown room. Although the fabricator was helpful in sending deliveries by building area, one of our greatest challenges remained the limited space.

Offloading trucks often had to be done with a crane, and temporarily shutting down parts of the surrounding streets sometimes became necessary to bring trucks in and out. Once the steel was offloaded, there sometimes wasn't room between the building and the road to move steel to the crane, so rigging and material handling took added time and planning to keep things moving. Due to the complexity and limited space, we dedicated a crew just to material shake-out. By doing so, we were able to keep the front-end erection crew moving and continue to hit benchmark completion dates.

In the end, by working closely with the general contractor and the other trades on the job, we were able to continually adapt to changing variables and perform our work without interrupting other contractors or the overall schedule.

Steel erection at Dallas ISD's Career Institute West.

From fabrication and erection to crane work and mechanical piping, our team is ready to help you deliver your next commercial project with confidence.